imgboxbg

CASE DETAILS

/
/
Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

2019-06-21 00:19:44

Nanjing Bosch Longtan Park Project
Nanjing Bosch Longtan Park Project
Nanjing Bosch Longtan Park Project
Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

4

Nanjing Bosch Longtan Park Project

Nanjing Bosch Longtan Park Project

  • Nanjing Bosch Longtan Park Project
  • Nanjing Bosch Longtan Park Project
  • Nanjing Bosch Longtan Park Project
  • Nanjing Bosch Longtan Park Project
Project Location: Nanjing, Longtan
Total Door Area: 120 square meters 
Door Construction Time: 2015
 
The project is located in the Longtan area of Nanjing. WinGreen provided all the entry doors for the office building and service podium of the Bosch office park. Most of them are connected to the curtain wall. The building of the park was built for about three years. During the use of the originally installed doors, there were many obvious sagging and hardware failures. The owner replaced the old doors with WinGreen's, which brought about an overall improvement in building energy efficiency as well as air-tightness and water-tightness, and the problem was effectively solved.
这是描述信息

Add:No. 6, Beishan Road, Gushan Industrial Zone, Jiangyin City, Jiangsu Province

Service Hotline: +86 021-32020879(Shanghai) / +86 18701783879(Shanghai)

Webpage copyright: Wingreen     苏ICP备16020467号-1      Powered By www.300.cn